Same electricity use. $66.41 more a month. What could your roof change?
*Con Edison’s Westchester annual-average total-bill example rose from $142.29 in 2021 to $208.70 in 2025 at 600 kWh a month: 46.7% higher. It includes delivery, supply and surcharges; your actual bill depends on your account and usage. Con Edison: Westchester 600-kWh annual-average bills, page 3
Your next utility bill is coming. Your solar comparison can start today. Find out what your roof could produce, what the project would cost and what you would still buy from Con Edison.
PV Design Engineer Sally Murphy on what going solar actually changes for the families she works with. And why she values staying connected long after the install is done.
THE KASSELMAN LEGACY. SINCE 1948.
Kasselman Solar · NYSERDA Platinum · Enphase Platinum
Kasselman Electric was founded in 1948; Kasselman Solar in 2014. Today, our NYSERDA Platinum Quality Solar Installer and Enphase Platinum Installer credentials sit alongside a dedicated in-house service team. Choose a team to support the system after installation. Kasselman Electric: company history and 1948 founding Kasselman Solar: 2014 founding and in-house service NYSERDA: residential installer directory Kasselman Solar: battery options and Enphase Platinum Installer
Kasselman Solar is committed to providing quality customer service and we believe that your solar panel installation should be worry free. That is why we provide innovative solar energy technology installed by highly trained professionals. Energy efficiency often requires making major lifestyle changes but going solar shouldn’t interfere with your daily routine. That’s the Kasselman Solar guarantee.
To ensure continued satisfaction after installation, we provide customers with the most popular and advanced monitoring systems from SolarEdge and Enphase. These cutting-edge solar monitoring systems can provide alerts directly to the customer once fully set up, ensuring you're able to identify any issues that may occur and reach out to our service team as soon as possible.
Know which incentives belong in your price. We review current program rules, qualifying equipment and available funding, and show eligible incentives separately in your proposal.
Your proposal identifies the equipment warranties and workmanship coverage that apply to your system. Our in-house service team supports you after installation, with service scope confirmed for your equipment.
Instead of having us talk about ourselves, why don’t we see what our clients have to say.
Con Edison’s approved plan runs through 2028. PSC: Con Edison approved 2026–2028 electric plan News 12 covered the approval, including customer concerns and the utility’s infrastructure explanation.
Your household’s decision is more specific: how much grid electricity could your roof replace? We compare your actual usage, export credits and remaining charges. Solar gives your home another source of electricity; it does not freeze Con Edison’s rates.
Your roof can produce electricity your home would otherwise buy. Roof condition, shade and annual use determine what solar could change. Start with your address, then compare production, installed price and remaining utility costs with our team. Want backup too? Tell us what must stay on.
Keep your solar working when the grid doesn’t. Add compatible storage and backup controls to run the loads included in your design and recharge from solar during suitable daylight. Tesla: solar recharge and Powerwall during outages
Powerwall 3 is one option to review for a Con Edison home. The utility lists it for its battery program; system approval, permits and enrollment remain separate. We’ll check your existing solar and backup priorities before recommending equipment. Con Edison: Bring Your Own Battery eligibility
Your home comes first. We use Aurora to design around your roof, shade and electricity use. Planning an EV or electric heating? Include it now. We’ll show the equipment, expected production, installed price and grid costs that remain. Already have solar? We review its inverter and electrical layout before recommending a battery.
Up to $11,250 in upfront NY battery incentives for qualifying homes. The Inclusive Storage Incentive pays $450 per approved usable AC kWh, up to 25 eligible kWh in an approved design. A qualifying disadvantaged-community address is one eligibility route; other routes use income or affordable-housing criteria. Project, equipment, funding and utility-program requirements apply. The incentive reduces your project cost in the agreement; an inquiry does not reserve funds. Check NYSERDA’s live funding dashboard.
Make incentives part of a clear proposal. Qualifying solar at an eligible New York principal residence can receive a state tax credit of 25% of eligible costs, up to $5,000. It is nonrefundable; unused eligible credit can carry forward for up to five years. Storage funding is separate and depends on the actual project. New York Tax Department: solar equipment credit NYSERDA: residential storage program requirements
Con Edison’s Westchester 600-kWh annual-average example rose 46.7% between 2021 and 2025. Separately, the approved 425-kWh illustration adds $4.94 monthly in 2027 and $4.95 in 2028. Your own usage and roof determine what solar could offset.
Con Edison: Westchester 600-kWh annual-average bills, page 3 PSC: Westchester 425-kWh approved bill examples
Your roof and electrical scope set the price. Shade, usable roof area, system size and battery choices affect the installed cost. Start with your address; then compare a design, projected production, payment options and remaining Con Edison charges.
Con Edison: homeowner solar and billing FAQs
Eligible exports receive private solar generation credits. You remain connected to Con Edison and may still owe grid-energy and fixed charges, including an applicable Customer Benefit Contribution. We review the account’s compensation rules and project date instead of promising a zero bill or a universal cash-out.
Con Edison: homeowner solar and billing FAQs Con Edison: residential solar bill example Con Edison: solar interconnection and compensation guide
Review Solar Against My Con Edison Bill
No. Con Edison serves different grid configurations, including some Westchester network areas. The actual service, equipment and connection point affect review. Local permits, inspections and utility permission are separate milestones; the design must match your address before an operating date is promised.
Con Edison: solar interconnection and compensation guide DPS: New York standardized interconnection requirements
With compatible backup controls, yes. Solar can power supported circuits and refill the battery during suitable daylight. We plan around the loads you want running, including motor-starting needs; available charge, sunlight and consumption determine how long backup lasts.
Tesla: solar recharge and Powerwall during outages Con Edison: homeowner solar and billing FAQs
Supported upgrades are possible. Tesla now documents adding Powerwall 3 to specific Powerwall 2 configurations; gateways, metering and software matter. Con Edison’s battery program expressly lists Powerwall 3, but installation permission and program enrollment are separate. We review both before quoting an eligible package.
Tesla: adding Powerwall 3 to supported Powerwall 2 systems Con Edison: Bring Your Own Battery eligibility
A qualifying New York principal residence may receive the state solar credit; eligible storage uses separate NYSERDA rules and funding. Con Edison has its own standard storage block. We itemize the approved pathway and tax assumptions, without adding the expired federal homeowner credit for new 2026 work.
New York Tax Department: solar equipment credit NYSERDA: current residential storage incentive blocks NYSERDA: residential storage program requirements IRS: homeowner clean-energy credit eligibility dates
No. The historical figures on this page are Westchester-specific. NYC projects also have separate building and fire-approval requirements for storage. Share the address for a service and permit review; a Con Edison program listing alone does not establish NYC installation permission.
Con Edison: Westchester 600-kWh annual-average bills, page 3 FDNY: energy-storage equipment approval and installation guide
1. Con Edison: Westchester 600-kWh annual-average bills, page 3.
2. PSC: Westchester 425-kWh approved bill examples.
3. PSC: Con Edison approved 2026–2028 electric plan.
4. News 12: Con Edison plan approved January 22, 2026.
5. Con Edison: homeowner solar and billing FAQs.
6. Con Edison: residential solar bill example.
7. Con Edison: solar interconnection and compensation guide.
8. Con Edison: Bring Your Own Battery eligibility.
9. Tesla: so
Know what your system is producing. We review the monitoring tools available with your selected equipment, including any additional hardware needed to see household consumption. Confirm setup, connectivity and alert settings with the installation team.